Bulk Math
Projects

Gravel calculator

Measure the area, set the depth. The ticket gives you tons, loads and cost.

Crushed stone is sold by the ton, so the number that matters is not volume — it is weight. The calculator works out the volume from your measurements, then converts it at the density you enter, because a ton of #57 stone and a ton of crusher run do not fill the same hole.

    Add an area
    in

    The finished depth of the gravel, not the hole.

    %

    Extra volume as a percentage of the measured total. This is an addition, not a percentage lost to shrinkage. Confirm it with your supplier.

    tons/yd³

    Placeholder range: 1.3 to 1.5 US short tons/yd³. Confirm the product density and whether it is loose or compacted.

    $

    Material price only. Delivery, minimum charges and tax are excluded. The default is a placeholder.

    How the number is worked out

    Area times depth gives cubic feet, divided by 27 gives cubic yards, multiplied by the density gives tons. Depth is where people slip: 4 inches is 0.333 ft, not 4. Each area is worked out on its own and added up, then the compaction allowance is applied to the total.

    area (ft²) × depth (ft) ÷ 27 × density (tons/yd³) = tons

    Choosing an extra-volume allowance

    The default adds 20 per cent to the measured volume as a planning placeholder, not a universal shrinkage rate. Use your supplier's loose bulk density and recommended extra volume for your product and placement. If you use a compacted density with a compacted depth, set the compaction allowance to zero to avoid counting it twice. A 20 per cent volume loss is not the same as adding 20 per cent: replacing that loss would require 25 per cent extra loose volume.

    What a ton actually covers

    One ton of ¾ inch crushed stone spreads about 100 square feet at 2 inches, or 50 square feet at 4 inches. Larger, more angular stone covers less. If your supplier quotes by the yard rather than the ton, the ticket shows both.

    Typical densities

    MaterialTons per cubic yardPounds per cubic yard
    ¾ in crushed stone (#57)1.42,800
    Crusher run / road base1.53,000
    Pea gravel1.32,600
    River rock, 1–2 in1.42,800

    Questions

    How deep should a gravel driveway be?

    Four inches of surface stone over four inches of a coarser base is the usual answer for cars; go deeper on soft ground or where trucks turn.

    Tons or cubic yards — which do I order?

    Whichever your supplier quotes. The ticket carries both, so you can read the one they ask for.

    Does the density really change the answer?

    Yes. At 1.3 against 1.5 tons per yard the same hole costs you fifteen per cent more or less stone. Ask the quarry for the figure for the exact product.

    Should I include compaction?

    For anything that gets driven on, yes. For a decorative bed you can leave it at zero.

    Other calculators

    The same ticket, the same assumptions on screen, for whatever else the job needs.